Component

Assemblies

One part number instead of twenty, and one supplier to chase instead of six.

We already make or source most of what goes into your sub assembly. Building it before it ships means you book in one item, hold one line of stock, and stop paying people to put it together on your own floor.

  • 1 Part number received instead of the whole bill of materials
  • 12mth Stock we will hold and call off against
  • 100% Assemblies inspected by Coler before dispatch

Assemblies at Coler

Most of our customers already buy several of the parts that go into a given sub assembly from us. The castings, the turned components, the fasteners, the clips, the mouldings. Building the thing rather than shipping the pieces is a short step from there, and it moves a cost off your floor.

The saving is rarely in the labour rate. It is in everything around it: one goods in booking instead of twenty, one line on the stock system, one invoice, one supplier to chase when something is late, and no part shortage stopping a build because the cheapest item in the kit did not turn up.

We build from components we source and make, so there is one owner for the whole bill of materials. Where something in the kit is yours, free issue works too. The assembly is inspected by us as a unit before it ships, which is a different and more useful check than inspecting each part on its own, because it catches the fit problems that only appear once things go together.

This is also what the PCL testimonial is describing when it talks about consolidating a supply base and working as lean as necessary. Fewer suppliers, fewer part numbers and stock held by us rather than by them.

The labour is not where the money is. The money is in the twenty goods in bookings and the one missing clip that stops a build.

Why customers move to buying the assembly

Scope
Sub and full assembly
Components
Ours, yours or both
Testing
To your drawing
Packing
Kitted or bulk
Stock
Up to 12 months
Labelling
Your part number

Also available

  • Free issue, where some components in the kit are supplied by you
  • Pressure, continuity and function testing where the drawing calls for it
  • Labelling and packing to your part number, ready to go straight to line
  • Call off against stock we hold, so your lead time is a day not a quarter

Specification

What we need to quote an assembly

A bill of materials, an assembly drawing and an annual quantity. If some components are already ours, say so and the quote gets simpler.

Assemblies
Bill of materials To drawingEvery item, with your part numbers. Flag anything you would rather keep buying yourself.
Assembly drawing To drawingIncluding torque figures, adhesive or sealant callouts and anything orientation critical.
Components Sourced by us, or free issueWe can own the whole kit, or build around parts you supply. Mixed is normal.
Testing Pressure, continuity, functionTell us the pass criteria and whether you need the results recorded per unit.
Annual quantity To drawingDrives whether this is bench build or a dedicated line, which is most of the price.
Packing Kitted, bulk or line readyLine ready packing costs a little more and removes a handling step at your end.
Stock holding Up to 12 monthsOrder ahead and call it off. The lead time then sits with us rather than in your plan.

Send the bill of materials and the assembly drawing and we will come back with a price per unit and a lead time. Request a quote.

Why buyers come to Coler for this

  • 01

    We chose the plant

    We do not own the machines. We qualified the people running them over 25 years, we part funded a good deal of the plant, and we place the work where it actually fits.

  • 02

    The inspection is ours

    Every batch is checked by us before it leaves. That is a second check on the plant, not a certificate you have to take on trust.

  • 03

    One order, one contact

    Casting, machining and finishing go on one schedule and one purchase order, so the part does not sit waiting between two suppliers.

  • 04

    ISO 9001:2015

    Held by Coler. The plants hold their own standards and we send the relevant certificate with the quote rather than waiting to be asked.

  • 05

    Specials, not catalogue

    Almost everything here is made to your drawing. If you need it to a print, that is the normal job rather than the awkward one.

  • 06

    Stock held for you

    Order up to twelve months ahead and call it off as you need it, which takes the lead time out of your own planning.

What counts as an assembly?

Anything made of more than one part that arrives as one part number. In practice that runs from two components pressed together up to a finished unit with twenty items, fasteners, a seal and a test certificate.

Common examples here are hose and fitting assemblies, clip and grommet kits, bracket and fastener sets, housings with bearings and seals already pressed in, and small mechanical units built from castings and turned parts.

If you are putting it together on your own floor from parts you buy, it is probably a candidate.

Does it actually save money?

Usually, but not always on the line you first look at. The assembly labour itself may cost roughly what it costs you, and the saving sits elsewhere.

The real reductions are in goods in handling, stock lines, purchase orders, invoices and expediting. A twenty item kit is twenty of each of those things, every time you order. It becomes one.

The other saving is shortage risk. When you buy twenty parts from six suppliers, the build stops if any one is late, and it is usually the cheapest item. When you buy the assembly, that risk moves to us.

If the sums do not work for your part, we will say so. An assembly that costs you more and saves you nothing is not a sale worth making.

Can you build with parts I supply?

Yes. Free issue is common and there is nothing awkward about it.

You send the components you want to keep buying yourself, we supply the rest, and we build and test the unit. We book your free issue stock in, hold it, and account for it against each assembly so you can see where it went.

The one thing worth agreeing up front is what happens to free issue parts that fail inspection, since those are not ours to scrap.

Where does the building happen?

At partner plants we have qualified, not plants Coler owns. Coler does not own machines or assembly lines. We specify the work, choose the plant, and inspect every assembly before it ships.

Coler Supply Solutions (Intl) Ltd holds ISO 9001:2015. The plants hold their own standards and we send the relevant certificate with the quote.

Machined fittings collected in a bin ready for dispatch

Get in touch today

Start with a drawing and a quantity

A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.

Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk
  • The team picks up every quote within the hour
  • NDAs signed before you send anything sensitive
  • You speak to an engineer, not a call handler

Enquiry

Request a quote

Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.

This field is for validation purposes and should be left unchanged.
Name(Required)