Capability

CNC Milling

Flats, pockets, slots and holes, in almost anything you can clamp.

The tool spins and the part stays still. 3 axis for prismatic work, 4 and 5 axis where the geometry has faces pointing in several directions at once and you would rather not pay for four separate setups.

  • 5 Axes available, so one setup instead of four
  • 0.01mm Tolerance held on milled features
  • 1 Minimum quantity, from a single prototype

CNC milling at Coler

Milling clamps the part and spins the cutter. That makes it the process for everything that is not round: housings, manifolds, plates, brackets, jigs, mould tool inserts and any block with pockets and faces cut into it.

The axis count is the decision that moves the price. A 3 axis machine cuts in X, Y and Z, which handles anything approachable from one direction. The moment the drawing has features on four faces, a 3 axis route means four setups, four clamping operations and four opportunities for the datum to shift, and the cost of that stacks up fast.

A 5 axis machine tilts and rotates the part under the spindle, so those same four faces are reached in one setup. The hourly rate is higher and the total is usually lower, because you are paying for cutting time rather than for a person re clamping the part. It also holds true position far better, since every feature is cut from one datum.

For a part that is mostly round with a few milled features, CNC turning with live tooling is usually cheaper than milling it. Milled parts needing a surface finish go through anodising or plating on the same order.

Count the faces on the drawing that need cutting. One or two is a 3 axis job. Four or more and 5 axis is usually cheaper despite the higher rate.

The quickest way to sanity check a milling quote

Envelope
To 1500mm
Axes
3, 4 and 5
Tolerance
To 0.01mm
Surface
To Ra 0.8
Materials
Metals, plastics
Quantity
From 1

Also available

  • 5 axis work, so a multi face part is cut in one setup from one datum
  • Machining of castings, forgings and extrusions supplied by us or by you
  • Engineering plastics including acetal, nylon, PEEK and PTFE
  • First article inspection reports and material certification

Order to delivery

From drawing to milled part

No tooling to pay for, so a prototype and a production batch follow the same route.

  1. Drawing reviewTolerances, datums and reachability checked before quoting
  2. Setup planningAxis count and fixturing chosen to cut the number of operations
  3. ProgrammingToolpath written and simulated before any metal is cut
  4. First articleFirst part measured against every dimension on the print
  5. Sample approvalNothing runs to volume until you have signed it off
  6. Production run3, 4 or 5 axis, by geometry and quantity
  7. FinishingDeburr, then anodise, plate or paint if specified
  8. Coler inspectionChecked by us against the drawing before anything ships

Marking up which dimensions are critical is the single cheapest way to bring a milling quote down.

Request a quote

Why buyers come to Coler for this

  • 01

    We chose the plant

    We do not own the machines. We qualified the people running them over 25 years, we part funded a good deal of the plant, and we place the work where it actually fits.

  • 02

    The inspection is ours

    Every batch is checked by us before it leaves. That is a second check on the plant, not a certificate you have to take on trust.

  • 03

    One order, one contact

    Casting, machining and finishing go on one schedule and one purchase order, so the part does not sit waiting between two suppliers.

  • 04

    ISO 9001:2015

    Held by Coler. The plants hold their own standards and we send the relevant certificate with the quote rather than waiting to be asked.

  • 05

    Specials, not catalogue

    Almost everything here is made to your drawing. If you need it to a print, that is the normal job rather than the awkward one.

  • 06

    Stock held for you

    Order up to twelve months ahead and call it off as you need it, which takes the lead time out of your own planning.

What is CNC milling?

A rotating cutter is driven against a workpiece that is clamped still, removing material to leave the shape on the drawing. Computer numerical control means the toolpath is a program rather than a person turning handles, so the hundredth part is the same as the first.

It is subtractive: you start with a solid block or a near net casting and cut away what is not the part. That is the opposite of casting or moulding, where material is added to a cavity, and it is why milling needs no tooling but costs more per part at volume.

The practical consequence is that milling wins at low quantities and loses at high ones. Below a few thousand a year it is almost always the cheapest route to a metal part. Above that, a casting or an extrusion machined afterwards usually beats it.

Do I need 3 axis, 4 axis or 5 axis?

3 axis moves the cutter in X, Y and Z. Fine for anything you can cut from one direction: plates, covers, simple brackets. Cheapest hourly rate.

4 axis adds rotation about one axis, which suits parts with features around a cylinder, like a manifold with ports at intervals round it.

5 axis adds a second rotation, so the cutter can reach any face at any angle in one setup. It is the right answer for impellers, complex housings and anything where true position between features on different faces has to be held.

The rule of thumb is to count setups rather than compare hourly rates. Four setups on a 3 axis machine normally costs more than one setup on a 5 axis machine, and it is less accurate.

Which materials can you mill?

Aluminium is the default and the cheapest to cut: 6082 and 7075 for structure, 5083 for marine.

Steels and stainless, including 304, 316 and tool steels. Slower to cut, so the price per part is higher than the material cost difference suggests.

Brass and bronze, which machine very cleanly.

Engineering plastics, including acetal, nylon, PEEK and PTFE, where the part has to insulate, run dry or resist chemicals.

The materials page has the grades and what each one suits.

Who runs the machines?

Partner plants we have qualified, not plants Coler owns. Coler does not own machines. The business grew out of automotive CNC supply, so we know what a good machine shop looks like, we part funded a good deal of the equipment, and we inspect every batch before it leaves.

Coler holds ISO 9001:2015. Plant level standards belong to the plant and we send the certificate with the quote.

Machined fittings collected in a bin ready for dispatch

Get in touch today

Start with a drawing and a quantity

A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.

Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk
  • The team picks up every quote within the hour
  • NDAs signed before you send anything sensitive
  • You speak to an engineer, not a call handler

Enquiry

Request a quote

Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.

This field is for validation purposes and should be left unchanged.
Name(Required)