Component
Medical Device Components
Components that have to fit together the same way in every batch.
We machine and mould for diagnostic, monitoring and surgical equipment, working to your drawing and your tolerance. Most of what we make for this sector is moulded housing and machined fittings, where consistency between batches matters more than any single part.
- 50,000 Largest run on this page, moulded consumables
- 0.1mm Tolerance held across the work below
- 100% Batch traceability back to the material
Material choice matters more here
We work in medical grade polymers, stainless steel and aluminium, and we hold batch traceability, so a finished part can be tied back to the material it came from. On most jobs that is good practice. On a medical device it is the thing an auditor asks for first.
Moulding for this sector runs out of medical grade non dust workshops, which is a different environment to general production and is the reason the same tool does not simply move between them. Injection moulding covers the housings, and CNC machining covers the fittings and anything that has to mate with them.
Send a drawing with the tolerance and the material you need. We come back with a price, a lead time and a first article before anything goes to volume.
Most of what we make for this sector is housing and fittings that have to fit together the same way in every batch.
Which makes repeatability the specification, rather than any single measured part.
What that covers
- Medical grade polymers, stainless steel and aluminium
- Moulding out of medical grade non dust workshops
- Batch traceability from finished part back to material
- First article before any production run
- Diagnostic, monitoring and surgical equipment
Specification
Medical component sizes and tolerances
The figures below are what the parts further down were made to, taken from the live page rather than estimated.
| Processes | Injection moulding and CNC machining |
|---|---|
| Materials | Medical grade polymers, stainless steel, aluminium |
| Environment | Medical grade non dust workshopsSeparate from general production, which is why a tool does not simply transfer between them. |
| Typical tolerance | ±0.1mmHeld across every part on this page. Tighter bands quoted per feature where the drawing needs them. |
| Traceability | Batch level, part back to material |
| Quantities | 1,000 to 50,000The range the parts below actually ran at. |
| Lead times | 15 to 60 daysLaboratory containers took 60. A radial fin component took 15. |
| Finish as standard | Deburr |
| Equipment supplied into | Diagnostic, monitoring and surgical |
Send the drawing with the tolerance, the material and the annual quantity, and tell us what your own approval process needs. Request a quote.
Why device builders use us
-
01
Traceability as standard
Batch level, finished part back to the material it came from, rather than as a paid extra bolted on at audit time.
-
02
Non dust moulding
Medical work runs out of medical grade workshops rather than sharing a floor with general production.
-
03
Repeatability over heroics
A housing that fits in batch one and batch forty is the requirement. Any supplier can hit a tolerance once.
-
04
Moulded and machined together
The housing and the fittings that mate with it come from one supplier, so the interface is one company’s problem.
-
05
First article before volume
Measured and signed off, so the first you see of a problem is not fifty thousand parts in.
-
06
Consumables at volume
Centrifuge tubes and laboratory containers run at fifty thousand off on the same line as the housings.
Recent work
Parts we have actually made
Each card carries the quantity, tolerance and lead time that job ran to.
-
Moulded monitor front cover
Front cover with display and control apertures, all of which have to land on the same assembly.
- Qty
- 2,000
- Tolerance
- ±0.1mm
- Lead
- 20 days
-
Moulded monitor shell
The mating half. Shell and cover are quoted together for a reason.
- Qty
- 2,000
- Tolerance
- ±0.1mm
- Lead
- 20 days
-
Moulded casing with handle
Integral handle, which is a moulding problem before it is a strength one.
- Qty
- 5,000
- Tolerance
- ±0.1mm
- Lead
- 30 days
-
Moulded radial fin component
Radial fins, where flow and mould filling pull in opposite directions.
- Qty
- 3,000
- Tolerance
- ±0.1mm
- Lead
- 15 days
-
Moulded electronics housing
Housing with fixing bosses moulded in rather than added afterwards.
- Qty
- 5,000
- Tolerance
- ±0.1mm
- Lead
- 30 days
-
Moulded centrifuge tubes
The highest volume part on this page. Consumables live or die on cycle time.
- Qty
- 50,000
- Tolerance
- ±0.1mm
- Lead
- 30 days
-
Moulded laboratory containers
Clear mouldings, where every flow line shows and the tool has to be right first time.
- Qty
- 1,000
- Tolerance
- ±0.1mm
- Lead
- 60 days
-
Moulded control panel fascia
A visible surface, so the finish specification matters as much as the dimensions.
- Qty
- 1,000
- Tolerance
- ±0.1mm
- Lead
- 20 days
Eight of the nine parts the live page lists have photography. The ninth is described there but has no image, so it is left off rather than represented by something else.
Also in the range
Other components for medical assemblies
A device is an assembly. These three usually come with the housings.
-
Precision parts
Machined fittings and mounts held to tight tolerance, on the same drawing pack.
-
Fasteners and spacers
Our medical customers work to the tightest drawings we see, and the fasteners follow them.
-
Injection moulding
How the housings above are made, and what the tooling decision looks like.
-
All components
The other nine component lines, from banjo bolts to bearings, in one list.
What does batch traceability actually give me?
A route from a finished part back to the material lot it was made from.
The practical value shows up when something goes wrong. If a batch of housings turns out to be brittle, traceability tells you whether it is one material lot or every part you have shipped this year. Without it, the answer is every part, and the recall is sized accordingly.
It also matters at audit. A notified body asking how you control incoming material wants to see the chain, not a statement that you have one.
Why does moulding have to be in a separate workshop?
Because contamination does not respect a process boundary.
General production generates airborne particulate: swarf, blast media, grinding dust. A moulded part with a visible surface picks that up at the point where it leaves the tool and is still warm, and by then the defect is in the part rather than on it.
Running medical work out of medical grade non dust workshops is not about the tool being different. It is about what the part is exposed to in the thirty seconds after it is made.
Can you hold tighter than 0.1mm?
Yes, and the parts on our precision parts page run at ±0.02mm and ±0.01mm.
On moulded parts the limit is different to machined ones. Shrinkage varies with wall thickness, material and how the part cools, so a tight band on a thick section is a tooling problem rather than a machining one and it is solved before the tool is cut, not after.
Tell us which feature needs the tighter band and why. On a moulded part, moving a gate is often cheaper than tightening a whole tolerance.
Get in touch today
Start with a drawing and a quantity
A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.
Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk- The team picks up every quote within the hour
- NDAs signed before you send anything sensitive
- You speak to an engineer, not a call handler
Enquiry
Request a quote
Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.