Component
P Clips and P Clamps
A loop with a flat foot, so a single bolt fixes a whole run in place.
We press them from steel, stainless and aluminium strip, form the loop, then roll the edges so nothing cuts into what the clip holds. Rubber and PVC lining goes on where the clip carries a hose or a cable that moves.
- 3 Materials: steel, stainless and aluminium strip
- 2 Linings: rubber and PVC, fitted before dispatch
- 0 Finishing operations left for your line to do
Rolled and lined before it leaves us
A P clip, also called a P clamp, holds cable, hose or pipe against a panel or frame. The name comes from the shape: a loop with a flat mounting foot, so a single bolt fixes the run in place. Sizes run from a few millimetres up to heavy pipe diameters.
Standard bores cover most hydraulic and wiring work. For anything outside that, send the bore, the strip width and the fixing hole size and we will make the tool. Runs start at prototype quantities and go up to volume. We work from your drawing or from a sample, so if you need a bore or a foot dimension nobody stocks, we press it rather than asking you to design around what sits on a shelf.
Where the clip needs a machined feature as well as a pressed one, it moves across to CNC machining. Clips ship alongside our fasteners and spacers and banjo bolts on the same order.
Every clip leaves us with the edges rolled and the lining fitted.
So the fitter on your line puts it straight on the run instead of dressing it first.
Supplied as standard
- Steel, stainless and aluminium strip
- Rubber and PVC lining where the run needs protecting
- Edges rolled as standard, not as an option
- Zinc and GeoMet plating through our plating partner
- Prototype quantities through to volume
Specification
P clip bore sizes, band widths and materials
Three dimensions get you a quote: the bore, the strip width and the fixing hole.
| Materials | Steel, stainless and aluminium strip |
|---|---|
| Bore | A few millimetres to heavy pipe diametersStandard bores held. Anything outside them is tooled from your drawing or a sample. |
| Strip width | To drawingSets how much the clip grips and how far it spreads the load along the run. |
| Fixing hole | To drawingOne of the three dimensions we need to make the tool. |
| Lining | Rubber and PVCFitted where the clip carries a hose or a cable that moves. Vibration and chafing are what it is there for. |
| Edges | Rolled as standardA cut edge against a moving hose is a hose failure in waiting. |
| Finishes | Zinc plating and GeoMetFrom our plating partner, to the corrosion specification the build calls for. |
| Quantities | Prototype through to volume |
| Applications | Hydraulic and fuel lines, wiring looms, plumbing and HVAC, control cables, sensor leads |
Send a drawing or a photograph with the bore and the material and we will come back with a price and a lead time. Request a quote.
Why buyers tool a special rather than design around a standard
-
01
The bore you actually need
A clip half a millimetre oversize rattles and a clip undersize crushes the hose. Neither is fixed by the fitter.
-
02
Edges rolled as standard
Not an option and not an upcharge. A cut edge against a moving hose is a failure waiting for the right amount of vibration.
-
03
Lined before dispatch
Rubber or PVC fitted here, so the clip goes straight on the run rather than through an assembly step at your end.
-
04
Tooled from a sample
No drawing needed. Send the clip you are using now and the bore you want, and we work from that.
-
05
Prototype to volume on one tool
The tool gets made once. First parts and the thousandth come off the same setup.
-
06
On the same order as the lines
Clips, banjo bolts and the fasteners around them on one purchase order, plated to one specification.
The parts
Clips we have made
Coler's own photography. Rubber lined clips with the edges rolled, in the standard two hole pattern.
-
Rubber lined P clips
The standard pattern. Lining fitted and edges rolled before it leaves us.
-
Single rubber lined clip
One clip, one bolt, one run held. The whole idea of the part.
-
Cushioned clips
Cushioned for a run that moves, which is most hydraulic and loom work.
-
Clips from smallest to largest bore laid out in a row on white
Photography to supply
A bore range together
The shot this page is missing. All three current photographs show broadly the same clip.
Three clip photographs exist and all three are used. The marked frame is the one shot that would sell the page, because the argument here is range and no current image shows it.
Order to delivery
How we make a P clip, from strip to finished part
Every clip job runs the same sequence. Knowing where your job sits tells you what happens next and what we need from you.
- Drawing reviewBore, strip width and fixing hole checked, or measured off the sample you send
- Tool designBlank development and forming sequence, which is what decides whether the loop closes round
- Tool manufactureMade by the tooling partner, so a bore change is an adjustment rather than a fresh search
- First off sampleOne clip pressed and checked on the actual hose or cable it has to hold
- Sample approvedNothing goes to volume until you have signed the sample off
- Production runPrototype quantities through to volume on the same tool
- Quality controlBore and hole position checked in process rather than sorted afterwards
- Rubber lining and finishEdges rolled, lining fitted, then plated to the corrosion specification
- Packing and deliveryPacked here and shipped to your delivery point on any incoterm
- Customer aftercareThe tool is kept, so a repeat order starts at production
If you are replacing a clip that keeps failing, send a failed one rather than a new one. Where it has worn tells us whether the bore, the lining or the spacing is the actual problem.
Request a quoteAlso in the range
What ships alongside a P clip order
A clip holds a run. These three are usually what is on the other end of it.
-
Banjo bolts
The fitting terminating the brake, fuel or oil line the clip is holding down.
-
Fasteners and spacers
The bolt through the clip foot, and the spacer setting it off the panel.
-
Automotive parts
Where rubber lined clips go out in volume, plated to the build corrosion spec.
-
All components
The other nine component lines, from banjo bolts to bearings, in one list.
How far apart should the clips go?
Close enough that the run cannot develop a rhythm.
Plumbing and HVAC installers space clips at fixed centres to stop the run drumming against a wall and to stop a joint working loose over a heating season. The failure is not the clip, it is the unsupported length between two of them resonating.
On machinery the same logic applies for a different reason. A loom that is clipped down is a loom that can be traced, and a hose that cannot move is a hose that will not chafe through against a frame. The clip is doing two jobs: holding position, and removing the movement that causes wear.
If an existing installation is failing, the spacing is worth checking before the clip is blamed.
Lined or unlined?
Lined wherever the thing being held moves, expands, or is softer than the clip.
That covers hoses, flexible conduit and cable looms, and it covers rigid pipe that expands and contracts with temperature. Rubber lining absorbs vibration and stops the clip working through the outer layer. PVC lining does a similar job where oil resistance or a wider temperature range matters.
Unlined is fine for rigid pipe clamped to a static frame with no thermal movement, and it is cheaper. It is the wrong answer everywhere else, and the failure takes a year to show up.
Can you match a clip I already use?
Yes, and a sample is better than a drawing for this.
Send one clip. We measure the bore, the strip width, the fixing hole and the foot dimension off the part itself, then tell you what it would cost as a special. If a standard bore happens to match it, we will say so rather than tooling something you do not need.
If the clip you are using is close but not right, say what is wrong with it. Half a millimetre on the bore is a tooling change, not a redesign.
Get in touch today
Start with a drawing and a quantity
A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.
Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk- The team picks up every quote within the hour
- NDAs signed before you send anything sensitive
- You speak to an engineer, not a call handler
Enquiry
Request a quote
Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.