Capability

Procurement Solutions

One purchase order instead of nine.

Manufacturing procurement and component sourcing, run as a service rather than sold as a list. We qualify the plant, place the part where it should be made, hold the schedule and carry the quality paperwork, so what reaches your desk is one supplier and one order rather than a supply base you have to manage yourself.

  • 27 Processes and component lines available on one purchase order
  • 5regions UK, USA, Europe, Far East and the Indian Sub-Continent
  • 25years Trading from Ningbo, alongside a second operation in Shenzhen

Manufacturing procurement, done as a service

Coler recognised that what customers needed from a supplier was changing, because they were being asked to compete in an increasingly global market. So the business was built for global procurement through partner plants it qualified and invested in, and kept UK manufacture and supply available as a standing option rather than as a favour.

In practice that means a buyer sends a drawing rather than a shortlist. We decide where the part should be made, against the process it needs and the annual quantity behind it, and that decision runs across precision component facilities in the UK, the USA, Europe, the Far East and the Indian Sub-Continent. One purchase order can then cover thirteen manufacturing processes, four finishing processes and ten component lines, which is the whole point: engineering procurement stops being a supplier management job and goes back to being a parts job.

The largest overseas operation is in Ningbo, China, trading successfully for over 25 years, with a second in Shenzhen. A real time communications link between there and the UK means a query raised here is answered there the same working day rather than the next week, which is the difference between a schedule that holds and one that slips a fortnight at a time.

Our growth has come from solving manufacturing and procurement problems customers felt they could only solve themselves, or could not solve at all.

Built on competitive pricing, quality components and schedule adherence. Very little else matters if those three hold.

What the service covers

  • Component sourcing against your drawing, sample or sketch
  • Supplier qualification and ongoing plant audit
  • Tooling specified, funded where it makes sense, and owned transparently
  • Consolidated ordering, so one PO replaces a scattered supply base
  • Schedule management and expediting across five regions
  • UK manufacture and supply whenever it is requested

Scope

What can be sourced, and from where

Component procurement covers everything in this list. The processes are the live list, and the regions are the live supplier partnership programme.

Procurement and sourcing scope
Machining CNC turning, CNC milling, multi axis, sliding head, coil fedPlaced against envelope and quantity rather than against whichever machine is nearest free.
Forming Pressed parts, cold forming, thread rolling, fabrication, laser cutting
Casting and moulding Die casting, sand casting, investment casting, forging, injection moulding
Finishing Electroplating, anodising, metal finishing, welding
Component lines Fasteners, bearings, spacers, clamps, fittings, rivets
Assemblies Sub assemblies and finished assemblies, shipped complete
United Kingdom Available on request on any job, not held back as an exceptionThe standing option. A part that should be made here gets made here.
Far East Coler operations in Ningbo and Shenzhen, running sourcing and oversight directly
Europe and USA Qualified partner plants inside the supplier partnership programme
Indian Sub-Continent Qualified partner plants inside the supplier partnership programme
Quality held ISO 9001:2015 held by Coler, IATF 16949 held by the automotive and safety critical plants
Export reach Over half of annual turnover exported, to nineteen countries across three continents

Send a drawing, a sample or a sketch and we will tell you where it should be made and what it will cost. Request a quote.

How a part actually gets sourced

Deciding where the part should be made

Strategic sourcing is a decision, not a directory. The same component can be the right job for a UK machine shop at 500 a year and the wrong one at 500,000, and the answer changes again if it needs a finish only two of the plants hold.

What we look at before placing anything:

Process fit
Which of the twenty seven processes and component lines the part actually needs, including secondary operations
Envelope
Whether the part fits the plant, rather than nearly fits it
Annual quantity
Which changes the economics of tooling, and therefore the region
Certification required
Automotive and safety critical work goes to IATF 16949 plant, medical into medical grade non dust workshops
Standing UK option
UK manufacture and supply is available whenever it is requested, on any job

Supplier sourcing and qualification

The supplier partnership programme is the part that takes years rather than weeks, and it is the reason a buyer can send one drawing instead of running a tender.

Plants in the programme were qualified and in many cases invested in directly, with plant specified and part funded by Coler. That is a different relationship to a broker holding a list of factories, because the equipment in those plants was chosen with the work in mind.

The Ningbo and Shenzhen operations are Coler operations rather than agents, which is what makes oversight a daily matter rather than an audit visit twice a year.

Tooling and first article

Tooling is where a sourcing arrangement is either honest or it is not, because whoever owns the tool controls whether you can ever leave.

Specification
Tooling specified against the drawing and the annual quantity, not against the cheapest route to a first part
Funding
Part funded by Coler where the volume justifies it
Rapid versus production
A prototype tool and a production tool are different purchases with different economics, and we say which one a job needs
First article
Approved before a production run starts, with in process gauging on the machines that hold it

Quality and traceability

Coler holds ISO 9001:2015. The plants making automotive and safety critical work hold IATF 16949, and approved supplier status in safety systems.

For a buyer the practical effect is that the certification paperwork arrives with the parts rather than being chased after a goods in query, and that batch traceability exists on the regulated work rather than being reconstructed later.

Schedule, expediting and consolidation

The failure mode in multi source procurement is not price, it is nine schedules that each slip a little and one line that stops.

Consolidating onto one purchase order moves that problem to us. The real time link between the UK and Ningbo is the mechanism: a query raised here is answered there the same working day, so an expedite happens inside a day rather than inside a week. Over half of annual turnover is exported to nineteen countries, which means the logistics side is routine rather than an exception being made for your order.

Cost down, and what we will not trade for it

Given the opportunity to tender, we can normally show a competitive cost saving against what is being paid now. That comes from placing the part in the right region and from keeping pace with developments in manufacturing technology, including CNC machining, where the efficiencies come from.

What does not move is the guarantee. We will not compromise on quality or on delivery targets to win an order, export or domestic. A saving that arrives with a quality escape attached is not a saving, it is a cost that has been moved onto your inspection department.

What is the difference between direct and indirect procurement?

Direct procurement buys what goes into the product. Indirect procurement buys what keeps the building running.

A bracket, a fastener, a moulded housing or a casting is direct procurement, because it ends up in the thing you sell and a failure in it is a failure in your product. Stationery, software licences, facilities contracts and travel are indirect, and they are bought on completely different criteria.

Coler is direct procurement only. That matters because the two jobs look similar on an org chart and are not remotely similar in practice: direct spend carries engineering drawings, tolerances, certification requirements, tooling, first article approval and traceability, and none of that exists on an indirect purchase. A procurement platform built for indirect spend will not hold a GD&T drawing, and a supplier set up for indirect spend cannot tell you whether your part should be cast or machined.

Is this outsourced procurement, or are you a supplier?

Both, and the distinction is worth being clear about rather than blurring.

Most procurement services in the UK are sold one of two ways. A pure outsourced procurement provider manages your supply base and charges a fee or a percentage for doing it. A supplier sells you parts. Coler sources, qualifies and manages the plant, and then sells you the parts on one purchase order, so the commercial relationship is a parts relationship rather than a consultancy retainer.

The practical difference for a buyer: there is no separate management fee to justify internally, and no situation where the people advising on where to place the part are paid regardless of whether the part turns up right.

Does everything get sourced overseas?

No. UK manufacture and supply is available whenever it is requested, on any job.

The business has supplied high precision components since 1952, from UK plant and from partner plant overseas, and the UK route is a standing option rather than something granted as an exception. Some parts are simply better made here: low volume, fast turnaround, a modification to an existing part, or anything where the freight and the lead time outweigh the unit saving.

What we will not do is force a part onto the nearest plant that will nearly take it. Send the drawing and the annual quantity and we will tell you where it should be made, which is sometimes here and sometimes not.

Machined fittings collected in a bin ready for dispatch

Get in touch today

Start with a drawing and a quantity

A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.

Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk
  • The team picks up every quote within the hour
  • NDAs signed before you send anything sensitive
  • You speak to an engineer, not a call handler

Enquiry

Request a quote

Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.

This field is for validation purposes and should be left unchanged.
Name(Required)