Capability
Welding Services
MIG, TIG and stud welding, to your drawing.
Mild steel, stainless and aluminium, from a single repair through to a production run of weldments. We can cut and fold the parts first, or weld components you supply, and the joint is inspected before anything ships.
- 3 Welding processes: MIG, TIG and stud
- 1 Minimum quantity, from a single part
- 1952 Making and joining metal parts since
Welding at Coler
We weld as part of a fabrication and we weld as a service on its own. If you have parts already cut and need them joined, send them. If you have a drawing and nothing else, we will laser cut and fold the parts first and weld them after, which is usually cheaper than buying the two operations separately.
Three processes cover almost everything that comes through. MIG for speed and penetration on mild steel, and for most structural work. TIG where the weld is visible, where the material is thin, or where it is stainless or aluminium and the heat input has to be controlled. Stud welding where a threaded fixing has to sit on a face with nothing showing on the other side.
The part of welding that decides whether an assembly is usable is not the bead, it is the fixturing. A frame welded freehand moves as it cools. We jig anything that has to hold a dimension across the whole build, and we check the assembly after welding rather than checking the first part and hoping.
A frame welded freehand moves as it cools.
Which is why the fixture matters more than the bead on anything that has to hold a dimension.
- Materials welded: mild steel, stainless, aluminium and brass
- 4
- Preparation on the same site: laser cutting and press brake
- 2
- Finishing processes available on the same order
- 4
- Joints inspected before dispatch
- 100%
What we weld
- Weldments and fabricated frames
- Brackets, mounts and sub frames
- Enclosures, panels and housings
- Guarding and machine frames
- Repairs and modifications to existing parts
- Welding on components you supply
Order to delivery
How a welding job runs, from drawing to dispatch
The same route whether we cut the parts or you send them.
- Drawing reviewWe look at the joint before we quote it. Where a weld is specified that the geometry will not allow, we say so then rather than at first article.
- Material and processMIG, TIG or stud, chosen against the material, the thickness and whether the weld will be seen.
- Cutting and formingLaser cut and folded on the same site, so the parts that arrive at the bench already fit each other.
- FixturingAnything holding a dimension across the build gets jigged. This is where distortion is controlled, not afterwards.
- Tack and checkTacked and measured before the full weld, because a frame that is out at tack is out at the end.
- WeldingSequenced to balance heat input rather than working along the part in one direction.
- DressingGround back and blended where the weld is visible or where a coating has to sit on it.
- FinishingBlasting, plating, painting or powder coating, on the same order rather than sent out.
- InspectionVisual on every joint and dimensional against the drawing on the assembly.
- Packing and deliveryPacked so the assembly arrives square, and delivered on your date.
Send a drawing, or send the parts. Either one gets a price and a lead time back, and if the job belongs with a specialist we will say so on day one.
Request a quoteDrawn
Three that decide the joint
Free to get right on the drawing, expensive to argue about once the part is on the bench.
-
Prepare the edge for the thickness
Under 5mm, butt it square with a root gap and run a pass from each side. Over 6mm a square edge cannot be filled to the root, so the edges are bevelled to a 60 degree included V and built up in passes. Specify the prep, not just the weld, or you are leaving it to whoever picks the job up.
-
Leg and throat are not the same number
Leg is measured along the plate. Throat is the short way, root to face, and it is about 0.7 of the leg. A drawing that says 6mm meaning leg, read as throat, gets a weld a third under strength. Write which one you mean.
-
Welding one side pulls the job over
A weld shrinks as it cools and drags the parent metal with it. Run one down a single side of an upright and it walks. Short runs alternating side to side keep it where you set it, which is cheaper than straightening it afterwards.
Send the drawing with the prep and the weld size on it and we will quote it as drawn. Send it without and we will ask, which costs both of us a day.
Why buyers send welding here
-
01
The parts are made in the same building
Laser cutting and press brake sit on the same site, so the parts arriving at the welding bench were cut to the same drawing by the same people. Most weld fit up problems are cutting problems, and they do not happen when one supplier owns both.
-
02
Fixturing is treated as part of the job
Anything that has to hold a dimension gets jigged and tacked before it is welded out. A supplier who welds freehand and measures at the end will pass you a frame that is square on the drawing and not on your line.
-
03
Finishing does not need a second supplier
Blasting, plating, painting and powder coating run on the same order. A welded assembly that has to travel to a finisher and back adds a fortnight and a second set of transport damage.
-
04
One part or a thousand
There is no minimum. A single repair is worth quoting, and so is a production run, and the same people look at both.
Our welding
Set up, welded, dressed
Three stages of the same job. Fixtured and tacked square, run out, then the seams dressed back before the part leaves us.
-
Fixtured and tacked square
-
TIG, stainless, as welded
-
Seams dressed flush
Read next
Related processes
What feeds the welding bench and what happens after it.
-
Metal fabrication
The whole assembly rather than the joint: frames, weldments and structures built to a drawing.
-
Sheet metal
Cutting and folding the parts that arrive at the welding bench already fitting each other.
-
Laser cutting
Trumpf flatbed cutting, and why fit up is really a cutting problem.
-
Types of welding explained
The background article on MIG, TIG, stud and beam welding, if you want the process rather than the service.
-
All services
Thirteen manufacturing processes and four finishing processes, in one list.
MIG or TIG for my part?
MIG if it needs to be strong and fast, TIG if it needs to be seen or it is thin.
MIG lays metal down quickly with good penetration, which suits structural steel work, thicker sections and anything where the weld will be hidden or painted. It is the cheaper process per joint because it is faster.
TIG is slower and more controlled. It suits stainless and aluminium, thin material that would blow through on MIG, and any joint that stays visible on the finished product. If appearance matters, say so on the enquiry, because it changes the process and therefore the price.
If you are not sure, send the drawing and tell us what the part does and whether the weld shows. That is enough for us to pick.
Can you weld parts I have already had made?
Yes, and it is a common job. Send the components and the drawing showing the joints.
The one thing worth knowing is that fit up drives weld quality more than anything else. If the parts were cut by someone else and the gaps are inconsistent, the weld has to bridge that, and a bridged gap is a weaker and uglier joint than a tight one. We will tell you if that is what we are looking at before we start rather than after.
Where a batch keeps arriving with poor fit up, it is usually cheaper overall to let us cut the parts as well.
Do you have coded welders?
Ask us, and get the answer in writing before you place safety critical work.
Coding, weld procedure specifications, EN 1090 execution classes and non destructive testing are all specific things with specific certificates behind them, and no supplier should imply them without naming which ones they hold.
For structural, pressure or safety critical work, send the specification with the enquiry and we will tell you plainly whether it is inside what we can certify or whether it belongs with a specialist. Being told no on day one is cheaper for you than finding out at inspection.
How do you stop the assembly distorting?
Fixturing, tacking and weld sequence, in that order.
The fixture holds the geometry while the heat goes in. Tacking and measuring before welding out catches anything that moved at assembly. Sequencing the welds to balance heat across the part, rather than running along it in one direction, stops it pulling to one side as it cools.
On a part where flatness or squareness is critical, tell us which dimension matters. We will fixture and sequence for that one rather than treating every dimension as equally important, which is how you end up holding none of them.
Get in touch today
Start with a drawing and a quantity
A single problem component, or a package you want off four suppliers and onto one. Tell us what you need and we will come back with a price, a process and a lead time.
Call us today on 01827 712910 Monday to Friday, 8am to 5pm · sales@coler.co.uk- The team picks up every quote within the hour
- NDAs signed before you send anything sensitive
- You speak to an engineer, not a call handler
Enquiry
Request a quote
Fill this in and the right person comes back to you. Got a drawing ready? Use the full quote form to attach it now.